Recertification Repairs  ·  Miami-Dade & Broward  ·  Structural · Electrical
30 · 40 · 50 · 60-Year · BSIP · Milestone
deficiency reports

Deficiencies in
your report?
We take it
from here.

From contractor bids and repair drawings to permits, inspections and the final compliance letter, Code Ready Miami coordinates the process. Licensed professionals do the work.

One point of contact. Less hassle. A clear path to compliance.

ApartmentsCommercialIndustrialHotelsChurchesCondos & HOAs

WHAT YOU GET

✓A first review of your report within 48 hours
✓Bids from licensed contractors on the same scope
✓Engineers for repair drawings and inspections
✓A schedule built around your deadline
You never receive an invoice from us. How we get paid →
Save time
No need to search for and coordinate several contractors.
Stay in control
Compare the bids and choose your contractor.
Deadline in sight
Repairs keep moving toward compliance. Structural work often takes four months or more, so start early.
30 seconds

What we do, in thirty seconds.

From the deficiency report to closeout: bids from participating licensed contractors, coordination with independent engineers, and one point of contact for all of it.

How it works

From deficiency list to certified building, in four steps.

Every recertification repair follows the same path. We know where the delays hide, and we keep the contractor, the engineer and the city moving at the same time instead of one after the other.

WEEK 1
01

Report review

Send us the full sealed deficiency report, from any engineer, through the form. We review it to organize the next steps and walk the building, so the contractors can price your engineer's scope accurately.

WEEKS 2–3
02

Contractor bids

Participating licensed Florida contractors price the same scope, with unit rates for concrete quantities that can only be confirmed once the work is opened. We lay the bids side by side; you choose. License and insurance certificates come with every bid.

MONTHS 1–4+
03

Drawings, permits, work

An independent Florida-licensed engineer prepares the repair drawings, the contractor pulls the permits, shoring goes in where needed and unit access is coordinated with your manager. We track progress and keep a before-and-after photo record for you or your board.

FINAL
04

Inspections & certificate

The engineer acting as special inspector documents the work as it's done, so city inspections and your reinspection don't wait on paperwork. Once the contractor closes out the permits, the engineer reinspects and seals the compliance letter, and we track every open item, including any open violation, until it's closed.

What gets fixed

Every repair your report calls for.

A recertification report can call for structural repairs of every kind, waterproofing and roofing, and electrical work, plus the drawings and inspections the city requires along the way. On your own, that means finding and managing several contractors and an engineer. With us, you have one contact for all of it.

STRUCTURAL

Concrete & structure

  • Structural repairs of every kind called out in the report
  • Spalling and rebar corrosion repair
  • Balconies, slabs, beams, columns, stairs and walkways
  • Eyebrows, canopies and parapets
  • Shoring and reshoring
  • Stucco and façade repairs, work at height with swing stages
WATERPROOFING

Roofing & waterproofing

  • Roof membrane repair and replacement
  • Insulation board, flashings, parapets and drainage
  • Balcony, deck and walkway waterproofing
  • Sealants, expansion joints and window perimeters
  • Roof-to-wall connections flagged in the structural report
ELECTRICAL

Service & systems

  • Service equipment and panel replacement
  • Feeders, grounding and bonding
  • Emergency lighting and exit signs
  • Thermoscan-flagged connections, tested and corrected
  • All work by a licensed electrical contractor
COORDINATION

What we handle

  • Bids from participating licensed contractors
  • Side-by-side bid comparison for you or your board
  • Communication with your independent engineer
  • Permit, inspection and violation tracking
  • Photo record and progress updates
We don't sell upgrades disguised as compliance. The scope is what your engineer's report calls for, nothing more. Repair drawings, shoring plans and special inspections are performed by independent Florida-licensed engineers retained by the owner.
Our role

What we do, and what we don't.

Recertification repairs involve your engineer, licensed contractors and the city. Here is exactly where we fit.

We do

  • Organize the next steps after your report
  • Obtain bids from participating licensed contractors
  • Coordinate with your independent engineer
  • Track permits, inspections and open items
  • Act as your single point of contact

We don't

  • Perform construction work
  • Prepare repair drawings or certify work
  • Perform inspections
  • Decide what's required: that's your engineer's report
  • Guarantee approvals or deadlines

Construction is performed by licensed Florida contractors who contract directly with the owner. Engineering and inspections are performed by independent Florida-licensed engineers.

Projects coordinated by our team

What it looks like when the concrete is opened.

Every report reads cleaner than the wall behind it. Here are three recertification repairs our team coordinated, from contractor selection to city sign-off.

Case study · Façade structural repairs

Historic 7-story residential building, Miami Beach

The report

The recertification report called for concrete repairs at window lintels and columns across the façade. Once the stucco came off, the lintels showed corroded reinforcing steel and the original wood formwork, left inside the concrete decades ago and rotted in place.

What we coordinated

  • Contractor selection: bids from licensed contractors on the engineer's scope; the owner chose.
  • Project coordination: swing stages, overhead protection at the sidewalk and work around residents who stayed in the building, on one schedule.
  • Engineer liaison: repair details for conditions found once the concrete was opened, and special inspections before each pour.
  • City inspections: scheduled and tracked through to sign-off.

Result

All repairs completed on schedule, at a fraction of the price the other bidders quoted. The city issued the building's recertification letter, valid for the next 10 years.

Window lintel opened, showing corroded steel and rotted wood formwork
Lintel opened: corroded steel and old wood forms
Removing deteriorated concrete from a swing stage
Removing failed concrete from the swing stage
Column opened with exposed reinforcing steel
Column opened for repair
New reinforcing steel installed in a lintel before the pour
New reinforcing steel, ready for inspection
Case study · Unsafe structure · Foundation repairs

Building under a vacate order, North Miami

The situation

The structural beams and slab at the base of the building had deteriorated badly: spalled concrete and heavily corroded reinforcing steel in the crawl space under the ground floor. The city ordered the building vacated until the structure was repaired.

What we coordinated

  • Contractor selection: a licensed contractor brought in quickly on the engineer's repair scope.
  • Shoring and access: temporary shoring under the ground floor and work in a tight crawl space, on one schedule.
  • Engineer liaison: repair details for conditions found once the concrete was opened, and special inspections before each pour.
  • City: permits, inspections and the review needed to lift the vacate order, tracked to sign-off.

Result

The entire building was repaired in three months, and the city authorized it to be occupied again.

Ground-floor beam opened, showing heavily corroded reinforcing steel
Beam opened: corroded steel at the base of the building
Deteriorated beams and slab in the crawl space under the ground floor
Deteriorated beams and slab in the crawl space
Temporary shoring posts under the ground floor during repairs
Temporary shoring under the ground floor
Case study · Emergency shoring · Eyebrow repairs

Hotel after an eyebrow collapse, Miami Beach

The situation

A concrete eyebrow over the hotel's windows collapsed, the city issued a violation, and the remaining eyebrows on the façade had to be secured right away, with the hotel still operating.

What we coordinated

  • Emergency response: a licensed contractor on site immediately to install emergency shoring under the eyebrows.
  • Shoring drawings: prepared by a Florida-licensed engineer and processed with the city.
  • Repairs: the eyebrows rebuilt, with the engineer acting as special inspector.
  • City: inspections tracked until the violation was cured.

Result

The eyebrows were repaired in eight weeks, with the hotel open throughout, and the violation was cured.

Scaffolding and shoring posts under the eyebrows of a Miami Beach hotel
Emergency shoring and scaffolding on the façade
Shoring posts and plywood supporting curved eyebrows
Shoring under the curved eyebrows
Close-up of shoring post supporting an eyebrow
Shoring built to the engineer's drawings
On site

What recertification repairs actually look like.

Structural repairs, waterproofing and roofing, and electrical work: the repairs a recertification report usually calls for, on South Florida buildings.

Spalling and exposed rebar on a rooftop bulkhead
Spalling and exposed rebar on a rooftop bulkhead
New slab reinforcement before the pour
New slab reinforcement before the pour
Balcony shoring while repairs are under way
Balcony shoring while repairs are under way
Façade repairs from a swing stage
Façade repairs from a swing stage
Electrical panel testing after a thermoscan
Electrical panel testing after a thermoscan
A corroded eyebrow slab, rebuilt
A corroded eyebrow slab, rebuilt
Insulation board fastened before the new membrane
Insulation board fastened before the new membrane
Roof membrane going down over the new insulation
Roof membrane going down over the new insulation
Finished roof membrane, equipment back in place
Finished roof membrane, equipment back in place
Fair scope

We coordinate repairs. We don't write your report.

Your deficiency report comes from your engineer. We don't write it and we don't change it. The bids we bring you contain only what that report calls for.

Bring us a report from any Florida-licensed engineer. We work from the scope exactly as your engineer wrote it; any question about what's required goes back to that engineer. We bring you bids from licensed contractors on that exact scope. You or your board compare, ask questions and pick among the participating contractors presented. You're always free to hire a contractor outside our network on your own; our coordination just doesn't extend to that contractor's work.

Our ground rules

  1. Every bid is priced on the engineer's sealed scope. Nothing the report doesn't call for.
  2. Bids from participating licensed contractors on the same scope. You choose among them.
  3. Fixed price plus published unit rates for hidden concrete quantities. No open allowances.
  4. Change orders only for conditions your engineer confirms in writing.
  5. Repair drawings and special inspections by independent Florida-licensed engineers.
  6. Permits and inspections are handled by the contractor and the engineer. We track them, and any violation closeout, for you.
  7. Every contractor is licensed and insured in Florida; license and certificates come with every bid.
  8. Code Ready Miami is retained as a consultant by the participating licensed contractors. The contractor you select signs with you, bills you directly and pays our fee.
  9. Our coordination covers projects awarded to participating contractors. You remain free to hire anyone else independently.
No-obligation report review

Send the deficiency report. We'll organize the next steps.

Within 48 hours we reply with a review of your report and the next steps. After a site visit, licensed contractors prepare their bids, usually within two to three weeks. No obligation.

If you have the deficiency report, attach the full PDF: we can't review a photo of one page. Only have a city notice or a violation? Send the form without the report and we'll take it from there. Unsafe-structure notice or open violation? Mark it urgent and it goes to the top of the list.

Miami-DadeBrowardUnsafe-structure casesHablamos español
The complete sealed report as a PDF, not a photo of one page. Max 8 MB.
By sending this form you agree to our Privacy Policy.
Report too large for the form? Email it to info@codereadymiami.com with the property address. We reply within 48 hours.
FAQ

Straight answers.

Do you do the recertification inspection? +
No. The recertification report comes from the engineer you hire. We coordinate the repairs, and we line up independent engineers for the repair drawings and special inspections the work itself needs. If you don't have an engineer for the recertification yet, we can point you to firms that handle it in Miami-Dade and Broward.
Can you work from another engineer's report? +
Yes, that's the normal case. Send the report; we review it on site, bring you bids from licensed contractors, and coordinate the reinspection with your engineer at the end.
My notice says 50-year (or 60-year). Is that the same? +
Yes. After a building's first recertification (at 40 years, or 30 under the newer rules), it has to recertify again every 10 years: the 50-year, 60-year and so on. It's the same process and the same kind of engineer's report, and we coordinate the repairs the same way.
Who picks the contractor? +
You do, among the participating licensed Florida contractors we present. Their bids come on the same scope, side by side, with license and insurance attached. We'll give you our view if you ask, but you or your board decide.
Can we use our own contractor? +
Not within our service. Code Ready Miami works only with the licensed contractors affiliated with us, because that's what lets us stand behind the schedule, the pricing and the coordination. If you'd rather use a contractor of your own, you can hire them directly, outside our service.
How long do repairs take? +
It depends on the scope. Electrical items alone can be done in weeks. A full structural scope, with repair drawings, permits, shoring and inspections, often takes four months or more, which is why it pays to start as soon as the report is in. Each bid comes with a schedule set against your county deadline.
We have an open violation or an unsafe-structure order. +
Act now. Repair drawings, shoring where needed and a signed contract are what the city needs to see to move your case from "open" to "in progress" and consider an extension. Mark it urgent in the form and it goes to the top of the list. If the repairs are not finished by the deadline, fines keep accruing and can become a lien on the property.
How is the price set? +
Each licensed contractor quotes a fixed price on the engineer's scope, with unit rates for concrete repair quantities that can only be confirmed once the work is opened. No allowances that balloon later. Change orders only for conditions your engineer confirms in writing.
How does Code Ready get paid? +
Code Ready Miami is retained as a consultant by the participating licensed contractors. The contractor you select signs with you, performs the work under its license, bills you directly and pays our fee. Every proposal states this in writing. You never receive an invoice from us, and if you don't hire any of the contractors, you owe us nothing.
What does a special inspector do? +
For structural repairs, the city can require a Florida-licensed engineer to inspect specific stages of the work, such as reinforcement before a pour. Having that engineer lined up from day one means the crew isn't left waiting for an inspection and the documentation is ready when the city asks for it.
Are you licensed and insured? +
Every repair is contracted with and performed by a Florida-licensed general or electrical contractor, fully insured, working under permit. The contractor's license number and certificates of insurance come with every bid. Code Ready Miami coordinates; it is not the contractor of record.
¿Hablan español? +
Sí. Presupuesto, contrato, obra y trámite pueden hacerse completamente en español.